In December 2023 MDS were invited by Liberty Industrial to tender for the licenced asbestos removal on The Northern Producer and following the evaluation process were successful in being awarded the contract.
At the start of 2024 MDS travelled to Strathcarron in Northwest Scotland to begin work removing asbestos from a production platform. The Platform was built in 1976 as a drilling rig before being converted to an FPF (Floating Production Facility) in 1991.
The Platform was anchored in Loch Kishorn in 2021 by owners Northern Offshore Ltd before entering the dry dock at Kishorn Port in October 2023 for decommissioning. Dismantling and recycling has been carried out by Liberty Industrial and when complete all arising materials will be transported via sea to foundries across Europe.
MDS undertook removal on both the lower and upper decks of the platform, playing their part in the decommissioning process. Working in adverse weather and encountering extremely high winds, MDS completed the removal successfully within the 25-day period that was initially proposed.
MDS played a vital role in the demolition process as the removal of asbestos meant the decommissioning could be done safely without posing any risk to other individuals working on the platform.